February 7th, 2010

College Park



College Park Phase 3 Residential Tower A
Gerrard Street West
Toronto, Downtown



floors: 42


After the T. Eaton department store vacated their College and Yonge location for the Eaton Centre in 1977, the store was refurbished as a mall, with some offices and a small residential tower attached. This project completed in 1979 and was Phase 1. Phase 2 included the construction of the Maclean-Hunter building and expansion of the mall, which completed in 1983. Phase 3 was to include an office building on Bay Street, and dense residential buildings along Gerrard Street, but was never realized.

Торонто - Могло быть так



Crystal Pyramid and Waterfront Office Tower
University Avenue
Toronto, Harbourfront


Project: Buckminster Fuller Proposal






По проекту Фуллера  University Avenue должна была пройти над железной дорогой, на южном отрезке она представляла собой закрытое пешеходное пространство с магазинами и ресторанами .
Офисная башня должна была соперничать с  TD Centre (56 этажей или 223м.). Так же в комплекс входила египетская пирамида  (800футов в основании, бысотой 400 футов)
На прямоугольных островах должны были расположиться жилые дома.

Так же по плану Фуллера Canadian National Exhibition  должны были перенести на место Downsview Air Force 




Кстати, монреальская биосфера - павильон США на выставке  Expo 67.    была построена по его проекту.


Другие неосуществленные проекты в Торонто можно посмотреть здесь
http://www.davidkopulos.com/torontopending/

Twitter


Как и многие не понимаю зачем он нужен.
Создала зачем-то.


twit73


может заодно кто-нибудь объяснит чем он хорош?

Разве что такую татуировку теперь можно сделать.))